EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
MartysRV14A
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (453)
Research
Workshop
- (4)
Empennage
- (54)
-
Empennage Fairings
-
Aft Fuselage: Fairings
-
Aft Fuselage: Fairings
-
Aft Fuselage: Fairings
-
Aft Fuselage: Trim...
-
Aft Fuselage:...
-
Aft Fuselage:...
-
Aft Fuselage: Top...
-
Aft Fuselage: Left...
-
Aft Fuselage: Right...
-
Aft Fuselage: Rudder...
-
Aft Fuselage: Skin...
-
Aft Fuselage: Rivet...
-
Aft Fuselage:...
-
Aft Fuselage:...
-
Aft Fuselage:...
-
Aft Fuselage:...
-
Aft Fuselage: Bulkheads
-
Aft Fuselage: Part...
-
Elevator: LE Rolling...
-
Elevator: Pitch Trim...
-
Elevator: Hinge Pin
-
Left Elevator: Final...
-
Left Elevator: Assembly
-
Trim Tab: Initial...
-
Left Elevator:...
-
Left Elevator:...
-
Right Elevator:...
-
Right Elevator:...
-
Right Elevator:...
-
Elevators: Match...
-
Elevator: Initial...
-
Elevator: Parts...
-
Elevator: Rib and...
-
Horiz Stab:...
-
Horiz Stab: Rear...
-
Horiz Stab: Cleco...
-
Horz Stab: Dimpling...
-
Horiz Stab: Cradle...
-
Horiz Stab: Front...
-
Horiz Stab: Match...
-
Rudder: TE Riveting...
-
Rudder: Riveting Skins
-
Rudder: Glue and...
-
Rudder: TE...
-
Rudder: Install Skin...
-
Rudder: TE Prep and...
-
Rudder: Cleco, Match...
-
Rudder: Assembling...
-
Vert Stab: Finish...
-
Vert Stab: Dimpling...
-
Vert Stab: Initial...
-
Vert Stab: Forward Spar
-
Empennage: Inventory
Wings
- (84)
Fuselage
- (47)
Avionics
- (31)
Engine
- (40)
Propeller
Firewall Forward
- (41)
Controls
Lighting
- (2)
Instrument Panel
- (3)
Fuel System
- (1)
Finish
- (63)
Painting
- (2)
Inspection
- (3)
Insurance
- (1)
Air Cond
- (35)
Cowling Mod
Interior
- (1)
Transport
- (4)
Training
- (2)
Final Assemb
- (4)
Pre-Flight
- (4)
Flight
- (19)
Maintenance
- (7)
Performance
- (1)
Builder Name:
Martin Guinn
-
Project:
Vans - RV-14A
-
VIEW REPORTS
Total Hours:
1990.5
Total Flight Time:
36.1
Total Expense:
N/A
Start/Last Date:
Aug 30, 2019 - Dec 06, 2021
Engine:
Lycoming YIO-390-A3B6 Thunderbolt
Propeller:
Hartzell
Panel:
G3X Touch/GTN 650xi, SteinAir
Friendly URL:
https://eaabuilderslog.org?s=MartysRV14A
Home or Last Project Picture
Dec 18, 2019
Empennage Fairings
- (10 hours)
Category: Empennage
Completed and installed horizontal and vertical tip fairings. Disassembled empennage from aft fuselage and transported to my hanger for storage.
IMG_6920.jpeg
IMG_6926.jpeg
IMG_6943.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.